Oak Grove: The Ponds WWTF Abandonment Bid Package The work for which bids are asked includes the complete removal and disposal of the following: Together with other miscellaneous structures and wastewater treatment facility piping. Note the City has removed the storage pond lining and the four constructed wetland cells that served 220 residential households. Brick Single Story Building with Basement (20’x38’) 1 LS, Pump House Building Slab with 6’ Diameter Wet Well 1 LS, Chlorine Contact Chamber (9’x20’x9’) 1 LS, 25,000 gallon septic tank 4 Each, 30,000 gallon filter tanks 2 Each, 20,000 gallon recirculation tanks 2 Each
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
93 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950