Topic RSS
MN - Moorhead: lift station demolition
Demolition for Storm Lift Station No. 3 Improvements. Work consists of the following approximate quantities: 1 LS Demo Existing Masonry Structure and Roof System located on top of cast-in-place concrete substructure. Includes Removal of Existing Electrical Controls, HVAC, Hatches, Etc. 1 LS Install New Exterior Electrical Controls to Operate Existing Two 60 HP Mixed Flow Propeller Type Pumps. 1 EA Standby Generator. 3 EA Aluminum Hatches. 2 EA 16
Forum Timezone: America/New_York
Most Users Ever Online: 429
Currently Online:
117 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950