MN DOA: REBID Ford Building Demolition. A. The work will be done under one prime contract that includes: General, Demolition, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of existing Ford Building in its entirety including a portion of underground tunnel structure, basement, four levels above grade, and associated site paving and walks. See drawings for items to be salvaged and returned to the Owner. 2. Temporary relocation and reconnection of electrical services routed through the current building out to the existing tunnel, surface parking lot, and other state office buildings. 3. Hazardous materials removal and elevator decommissioning to occur prior to demolition work. 4. New site work includes partial stie restoration, concrete sidewalk replacement, and capping and waterproofing of existing underground tunnel syste
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
93 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930