Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MN - MN DOA: Demolition/Building Removal/Hauling/Salvage - Upgrade HVAC and Controls for Minnesota Veterans
December 1, 2024
8:12 AM
Avatar
Admin
Forum Posts: 7210
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

MN DOA: Demolition/Building Removal/Hauling/Salvage - Upgrade HVAC and Controls for Minnesota Veterans Home-Luverne. Project Description: Mechanical Systems, Construction, Demolition/Building Removal/Hauling/Salvage, Electrical Description: State Project Number 75LN0022 Upgrade HVAC and Controls for Minnesota Veterans Home - Luverne A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Disconnect and remove existing pneumatic controls and building automation system (BAS) components serving existing heating, ventilation, and air condition system (HVAC) equipment and fire/smoke dampers (existing chilled water valves to remain). 2. Provide new BAS components and programming, including fire/smoke damper control. 3. Provide shaft grounding kits for pump and fan motors receiving new speed controllers. 4. HVAC Testing and balancing (TAB) before demolition begins. 5. HVAC TAB after new BAS is operational. 6. HVAC Commissioning functional testing after BAS is operational. 7. New air compressor for dry pipe fire protection serving exterior canopy. Existing air compressor and filter/dryer shall remain in service for shop air purposes. 8. New adjustable speed drives for hydronic heating secondary pump motors. 9. Fire alarm panel interface for new fire/smoke damper actuators. 10. Project will be accomplished in phases with Owner maintaining occupancy throughout the construction process. Contractor shall include an accommodation for project phasing in preparing their bid for the Work

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
76 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3053

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20211

Posts: 28445

Administrators: JOHN: 7602, John: 7210

Skip to toolbar