Hennepin County: Bridge replacement. Bridge replacement on CSAH 146 (Brown Road South) bridge over Long Lake Creek in the City of Orono. The major items of work are approximately: 1 ls mobilization, 1 ea field office type D, 1 ea field laboratory type A, 249 cy common excavation, 715 cy excavation special 1, 515 ton aggregate base class 5, 293 ton type sp 12.5 wearing course mix (4,C), 311 ton type sp 12.5 non wear course mix (4,C), 1 ls remove regulated waste material (bridge), 64 cy structural concrete (3B52), 16650 pound reinforcement bars (epoxy coated), 1 ls structure excavation, 1635 sf bridge slab concrete (3YHPC-M), 107 lf structural tube railing design T-2, 266 lf prestressed concrete beams 14RB, 191 sy bridge approach panels, 1 ls remove existing bridge, 960 lf C-I-P concrete piling 12", 1 ls traffic control, 1 ls detour signing, 100 ud portable changeable message sign, 1 ls erosion control supervisor, all in accordance with the specifications and bid forms.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
85 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090