Fairmont: Ground Storage Reservoir Improvements. Project Description: Water/Wastewater Infrastructure, Demolition/Building Removal/Hauling/Salvage, Electrical and Controls, Waterlines Description: 1. Construct a new 2 MG ground storage reservoir tank with related piping and valves. 2. Demolish existing ground storage reservoir tanks and all related appurtenances. 3. Remove existing pipe and insulation stored on site, indicated on plans and Appendix B, and dispose of it in a certified landfill. These materials are expected to contain asbestos. 4. Replace existing propeller flow meters with new mag meters in existing booster station. 5. Replace existing electrically actuated butterfly valve with new electrically actuated butterfly valve. 6. Replace existing Katolight generator with new diesel generator and replace existing manual transfer switch with new automatic transfer switch. 7. Various trades throughout the project including electrical, controls, painting, and civil site improvements.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030