MN DOA: Ford Building Demolition and Tunnel Structure. Project Description: Construction, Demolition/Building Removal/Hauling/Salvage Description: State Project Number 02FB0006 Ford Building Demolition and Tunnel Structure This Project has an 8% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of existing Ford Building in its entirety including a portion of underground tunnel structure, basement, four levels above grade, and associated site paving and walks. See drawings for items to be salvaged and returned to the Owner. 2. Temporary relocation of electrical services routed through current building out to surface parking lot and other state office buildings. 3. New site work includes site restoration, asphalt paving patching, concrete sidewalk, landscaping. 4. Reconnection of electrical services. New low voltage security equipment.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
38 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030