Crow Wing - Brainerd: 2.0 MG Water Storage Tank Re-Bid. Major components of the Work include: Demolition of existing concrete and steel ground storage tanks on site at the Water Treatment Facility. Site water main improvements. Site and grading work. New 2.0 MG concrete water storage tank with two 1.0 MG storage compartments (cast in place). Architectural concrete form liner features. Process Piping. Process and valve control room. Associated electrical and mechanical features. Site landscaping.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
134 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3043
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20071
Posts: 28305
Administrators: JOHN: 7602, John: 7070