Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MN - Becker County: SHELL LAKE DAM REMOVAL
May 14, 2017
5:52 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

SHELL LAKE DAM REMOVAL. The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary to demolish and remove existing concrete outlet dam. Contractor will be required to demo and remove the existing concrete dam. Dam demo and removal shall include all concrete, steel, wood and any other materials to an elevation 3 ft. below existing lake/stream bottom. See general drawings of typical dam construction during that time era. If it becomes necessary to dewater for dam removal, the contractor shall submit their dewatering plan to the engineer. The plan must be approved before any dewatering in started. Erodible coffer dam material will not be allowed, so no free embankment. Water pumped from excavation must be run through filter bag sized for discharge. The project location is near City of Osage, Becker County, Minnesota

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – try a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
126 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar