Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MI - Pinckney: demolition of 9 buildings some w/asbestos
September 30, 2012
6:15 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Camp Brighton Demolition and Site Restoration. The Work includes, but is not necessarily limited to: Demolition and removal of approximately nine (9) buildings and structures located around the project site. This includes removal of all mechanical and electrical systems within the buildings and some asbestos abatement. Building construction varies from wood frame, steel frame, and masonry. All material is to be removed from the project site and disposed of properly. All above and underground utilities located within the site are to be removed and/or abandoned in place. The five (5) drainage fields and two (2) rapid infiltration basins are to be abandoned according to MDEQ requirements. Soil testing and groundwater monitoring are required. The entire project site shall be graded to allow for drainage and restored completely. All work shall be done in accordance with the plans and specifications. Bids due 10/17

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
73 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar