Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MI - Newberry: selective demolition at prison w/asbestos
January 20, 2013
5:47 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Newberry Correctional Facility - Selective Demolition.Inspect the three buildings, get asbestos surveys done for all three buildings, sweep buildings of all hazardous (RCRA, TSCA, FIFRA) material, infectious material, radioactive material, and other material that cannot remain for demolition (e.g. Freon, compressed gasses), contract for asbestos removal, write demolition and restoration specifications, bid the demolition package, oversee utility cutoff, demolition, and restoration, and lastly document the work. Bids due 02/07

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
106 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar