Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MI - Kalamazoo: Asbestos Removal & Demolition of Seventeen (17) Houses
September 6, 2015
6:04 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Kalamazoo: Asbestos Removal & Demolition of Seventeen (17) Houses. SCOPE OF WORK/ PROJECT DESCRIPTION The project includes complete demolition and removal of the buildings/structures listed below and restoration of the project site following the general specifications detailed in Section III - GENERAL SPECIFICATIONS FOR RESIDENTIAL DEMOLITION. Professional surveys/inspections of these structures have been completed to determine presence, types, quantities and locations of asbestos-containing materials (ACM), mercury, and household hazardous waste unless otherwise noted as PACM. A partial report will be distributed to each firm attending the Pre-Bid Inspection. Proper removal of any and all such materials shall be the responsibility of the successful demolition bidder and all costs for removal shall be included in the bid for each site. Please invite any potential sub-contractors to attend the mandatory pre-bid inspections. . SCOPE OF WORK/ PROJECT DESCRIPTION The project includes complete demolition and removal of the buildings/structures listed below and restoration of the project site following the general specifications detailed in Section III - GENERAL SPECIFICATIONS FOR RESIDENTIAL DEMOLITION. Professional surveys/inspections of these structures have been completed to determine presence, types, quantities and locations of asbestos-containing materials (ACM), mercury, and household hazardous waste unless otherwise noted as PACM. A partial report will be distributed to each firm attending the Pre-Bid Inspection. Proper removal of any and all such materials shall be the responsibility of the successful demolition bidder and all costs for removal shall be included in the bid for each site. Please invite any potential sub-contractors to attend the mandatory pre-bid inspections. Bids due 09/29

Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking a trial to qualify)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
84 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar