Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MI DOT: THREE SEPARATE BRIDGE REMOVAL PROJECTS
January 10, 2021
9:11 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

658299 Demolition MI Cass: MDOT, Bridge removal and replacement with rolled steel beams and approach work on O'Keefe Road over Dowagiac Creek, Cass County. 2021-02-05
658298 Demolition MI St. Clair: MDOT, Bridge replacement with 3 span timber laminated plank superstructure to include steel piles, cofferdams, steel sheet piling, approach work, con 2021-02-05
657717 Demolition MI MDOT: Bridge replacement with 21 inch prestressed concrete box beams, concrete curb and gutter, culverts, drainage, guardrail, approach and pavement markings on

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
25 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar