County of Calhoun: Demolition - 19 Properties. The CCLBA seeks sealed proposals from Respondents to provide demolition, recycling, proper waste disposal, site protection, and site restoration in total compliance with all federal, state and local regulations, for properties identified in Appendix A. The parcels contain abandoned and blighted residential structures, and in some cases debris (e.g. trash, tires, downed trees) that also needs to be removed. All structures on each parcel will be demolished including garages and/or outbuildings, unless otherwise stated in this RFP. All garbage and debris (brush, limbs, tires, etc) must also be removed. Also, all footings and foundations are to be removed pursuant to local municipal requirements, site backfilled with clean (non-hazardous) fill material (sand, dirt), compacted, graded, and seeded. Retaining walls are to be removed on a case by case basis. Contractors will provide a plan for the recycling of demolished materials when possible. Utility shutoffs (electricity, water, and gas) will be arranged for and paid for by the CCLBA. Water and sewer capping will be the responsibility of the Contractor and the Contractor will be responsible for coordinating with the local permitting department/agency for final clearance. There are two demolitions that are asbestos containing material (ACM) due to fire damage will be considered Ordered Notice demolitions
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
45 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090