Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME - Wells: partial pier demolition including piles etc
March 3, 2013
10:28 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Bait Pier Reconstruction Project Project Identification: Maine Department of Transportation, Small Harbor Improvement Project The project involves replacement of an approximate 10-ft by 13-ft section of the Town Pier system known as the Bait Pier. The municipal facility is located at the end of Harbor Road. Replacement of this pier section includes: Demolition; disposal of demolished materials; replacement of the timber piles, pile bracing, substructure, decking and railings within the existing structure footprint and raised approximately 15 inches to match the Main Pier deck height. Bids due 03/13

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
96 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar