University of Maine: 113 & 117 College Ave Demolition. Demolition and disposal of 113 & 117 College Ave on the University of Maine Orono Campus. Work consists of perimeter fencing, protections of existing adjacent utilities, removals of sections of pavement, replacing sections of sidewalks, site restoration, and grading. The University will disconnect utility feeds to the building. The contractor will be responsible for capping utility lines and conduit below grade, as well as coordinating with the University on the installation of new electric and data feeds to emergency station.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
73 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20012
Posts: 28246
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7010