Scarborough: Seawall System Replacement. The demolition and replacement of 1,130 feet of existing timber seawall that includes nine (9) contiguous shore-front properties on Scarborough Beach. The replacement seawall includes FRP sheet piles, timber sheathing, and includes substantial sand beach nourishment and dune grass planting. The regulatory time-frame allowed for the work is September 30, 2020 to April 1, 2021. Performance and Payment Bonds.are required.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
62 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950