Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME Scarborough: demolition and replacement of 1,130 feet of timber seawall, includes nine (9) contiguous shore-front properties
June 21, 2020
9:15 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Scarborough: Seawall System Replacement. The demolition and replacement of 1,130 feet of existing timber seawall that includes nine (9) contiguous shore-front properties on Scarborough Beach. The replacement seawall includes FRP sheet piles, timber sheathing, and includes substantial sand beach nourishment and dune grass planting. The regulatory time-frame allowed for the work is September 30, 2020 to April 1, 2021. Performance and Payment Bonds.are required.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
62 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar