Portland: Portland Ocean Terminal Pier 1 Fender Replacement. Portland Ocean Terminal Pier 40 Commercial Street Portland, Maine work includes but will not be limited to the demolition of (430) linear feet of existing fender system, providing (36) new fender piles with energy absorbing blocks and, reinstalling (9) existing composite marine camels and (18) existing chain and weight assemblies, and providing other miscellaneous repairs as shown on the plans and specifications. The project also includes alternate bids for (2) new 100 ton bollards. Each of these bollards are a separate alternate whose award will be decided at the same time as the award of the fender system project.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
40 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950