Paris Utility District: Hooper Ledge Tank Replacement. The Project includes the following Work: A tank replacement including demolition of the existing storage facility, site work, and construction of a new 500,000-gallon prestressed wire wound concrete water storage tank adjacent to the existing tank. The project also includes an active tank mixer, new instrumentation and radio equipment, an extension of single-phase electrical service eliminating the existing solar powered radio system, and upgrades to the existing access road including a new gravel base and cross culvert. Owner anticipates that the Project's total bid price will be approximately $1,400,000.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
96 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950