Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME - Newport: School Demolition
July 9, 2017
9:01 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Newport: RSU 19 New Nokomis Middle/High School - The project also includes demolition of the existing school building. The project consists of the construction of a new 212,500 sf school and a 3,000 sf boiler plant. The construction consists of excavation; utilities; paving; athletic fields; landscaping; concrete foundations; steel structure; brick veneer and unit masonry; metal siding; fiber cement panel siding; building insulation; doors, frames, aluminum windows, and aluminum curtainwall; roofing; interior partitions; finishes; gym equipment; kitchen equipment; hydraulic elevator; and complete fire suppression, mechanical, plumbing, securing access, instructional technology and public address systems including incidental work.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL no credit card required

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
78 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar