ME Maritime Academy: Maine Maritime Academy Bucksport Fire Training Facility Demolition. The project at 24 Mariner Way, Bucksport, Maine, consists of demolition, construction, and erection. Demolition work includes the demolition and disposal of existing surface and underground features such as a concrete slab, foundation, etc. within the limits of work. Construction work includes construction of a 31,000 S.F. parking area, a 22' x 75' concrete building foundation with perimeter slab and drain, accessory concrete pads, utility piping, paved maneuvering area, etc. Erection work includes the erection of an owner-provided, pre-engineered, four- story steel fire training building upon the new foundation.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
89 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950