Atlantic Salmon Federation: Coopers Mills Dam Removal and Site Enhancement GENERAL DESCRIPTION OF WORK In general, this project, located on the Sheepscot River, includes structure removal to enhance fish passage and fire protection water supply dry hydrant system replacement. The work includes, but is not limited to, the following: 1. Access development and erosion, sediment, pollution and water control. 2. Demolition of dam spillway, fish ladder, abutments, portions of the former mill foundation, and other features. 3. Installation of a new fire protection water supply hydrant system. 4. Construction and installation of a new concrete and masonry overlook structure and other site improvements. 5. Site restoration. PREQUALIFICATION Each bid must be accompanied by a list of at least three projects completed that demonstrate expertise in each of the following major areas of work: 1) dam removal and river restoration, 2) dry hydrant and/or water piping system installation, and 3) public site landscape improvements including stone masonry.
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
78 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090