Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
ME - Brunswick: demolition of 20+ buildings w/hazmat
February 24, 2013
6:27 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

BRUNSWICK LANDING PHASE 1 BUILDING DEMOLITION PROJECT. The work in general consists of: Providing all labor, materials, equipment and all appurtenances necessary for the complete building demolition, removal and site restoration of Brunswick Landing Housing Quarters and Garages D, E, F, G, H and I, Brunswick Landing Buildings 109, 415, 402, 403, 637, 628, (225, 20, 41, 629, 630, 631, 633, 634, 661 and 662)* and Topsham Annex Buildings 332, 336, 337, 338 and 363 including, but not limited to: the isolation, capping, disconnecting and/or removal, as necessary of all water, sewer, gas, electrical, telephone and cable service systems from point of service connection at Utility to housing or buildings prior to demolition; comply with Material Management Plan (MMP) for MMRA for testing & classifying of soil (by Owner), stockpiling, removal and disposal of potentially contaminated soil associated with utility excavations or other excavations of in situ soils at Brunswick Landing Buildings (225, 41, 629, 630, 631, 633 and 634)* and Topsham Annex Buildings 332, 336, 337, 338 and 363; proper removal and disposal of all housing and building asbestos containing materials in accordance with State & Federal regulations from Brunswick Landing Housing Quarters D, E, F, G, H and I, Brunswick Landing Buildings 109, 415, 402, 637, 628, (225, 20, 41, 629, 630, 631, 633 and 634)* and Topsham Annex Buildings 332, 336, 337, 338 and 363; proper removal and disposal of all housing and building lead based paint materials in accordance with State & Federal regulations from Brunswick Landing Housing Quarters and Garages D, E, F, G, H and I, Brunswick Landing Buildings 402, 637, 628, (225, 20, 41, 629, 630, 631, 633 and 634)* and Topsham Annex Buildings 332, 336, 337, 338 and 363; proper removal and disposal of all housing and building universal waste materials in accordance with State & Federal regulations from Brunswick Landing Housing Quarters D, E, F, G, H and I, Brunswick Landing Buildings 109, 415, 402, 637, 628, (225, 20, 41, 629, 630, 631, 633 and 634)* and Topsham Annex Buildings 332, 337, 338 and 363; proper removal and disposal of all housing and building furnishings, equipment, non-ACM flooring, oil Bids due 03/08

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
127 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar