Bar Harbor: Demolition of a Highway Maintenance Garage The work shall consist of the following; removal and disposal of existing bridge deck and guardrails, removal and disposal of existing pavement and unsuitable subgrade, removal of stone abutments and reuse as stabilization elsewhere on the project, provide and install new pre-cast concrete wall abutments and backfill, provide and install new pre-cast concrete bridge deck, provide and install new gravel subbase and base material, provide and install new pavement, provide and install new guardrail system, and provide and install new seed and mulch to areas disturbed during construction.
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
26 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090