Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MD - Naval Facilities Engineering Command: (RFQ) Demolition of 12 Buildings
July 30, 2017
8:34 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Naval Facilities Engineering Command: (RFQ) Demolition of 12 Buildings. The proposed project scope includes the demolition of 12 buildings with the approximate total square footage of 76,243SF at sites throughout the Naval Air Station Patuxent River. The contactor shall provide all equipment, labor, materials, tools, expertise, and disposal means needed to execute this scope of work. The contractor shall demolish all facilities and their associated utilities, infrastructure, roofing, siding, foundations, windows, interior improvements, mechanical and electrical equipment, and any other aspects of the building. If any facility, when demolished, leaves any grade that is below that of the grade surrounding the area of the demolished building, that area is to be backfilled with earth to make the site uniform and level, and shall be able to drain in wet weather. All improvements involving these facilities shall be removed unless parts are to remain to preserve a neighboring facility. Within these facilities, there are known cases of asbestos, mold, and lead-based paint. The various buildings consist of standard commercial or storage interiors. Building 461 does contain a commercial kitchen; an indoor; in-ground pool with depths ranging from 3 to 10 feet; and multiple dining, office, and admin spaces. The contractor shall also remove the basement of building 461, approximately 1,000sf, which is located approximately 20 feet below grade and contains the buildings mechanical equipment. While demolishing building 461, contractor shall ensure that all sewage lines flowing to and from that building are kept operational during demolition.

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL no credit card required

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
67 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar