Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MD - La Plata, wwtp demolition
January 2, 2011
5:26 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Sealed bids for construction of the La Plata Wastewater Treatment Plant Enhanced Nutrient Removal Upgrade In general, the Work includes, but is not limited to the following: 1. Existing Control Building addition, complete with process control facilities.2. Existing Blower Building addition including new process blower equipment, electrical, instrumentation, and controls. 3. New process module tank, including diffused air equipment, mixers, pumps, process piping, electrical, instrumentation, and controls. 4. New digester blower including process piping, electrical, instrumentation, and controls. 5. Retrofit of existing process module tanks, including diffused air equipment, mixers, electrical, instrumentation, and controls. 6. New process module RAS pump station building including pumps, electrical, instrumentation, and controls. 7. New denitrification filter and retrofit of existing sand filters including a methanol feed system with methanol storage tank, spill containment structure, and methanol feed pumps, backwash air compressor, and phosphoric acid feed system and controls. 8. New rapid mix tank including cast-in-place structure, mixer, electrical, instrumentation and controls. 9. Compressor building modifications, including new piping, electrical, instrumentation, and controls. 10. Power distribution system modifications and Process Control System. 11. Alum feed system modifications, including piping, electrical, and controls 12. Polymer feed system, including piping, electrical, and controls. 13. Associated site work and yard piping.14. Demolition of existing facilities Estimated Construction Cost: Over $5,000,000 Bids due 03/01

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
81 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar