6:58 AM
June 8, 2006
UMASS Medical School: Basic Wing 4th Floor Interior Demolition and Abatement. The project includes demolition of lab spaces totaling approximately 8,800 net square feet. Work will include the demolition of existing lab benches, CMU walls, ceilings, selective HVAC removal, plumbing demolition including acid waste, natural gas, lab water, compressed air and vacuum piping, electrical safe-off and selective demolition and removal of misc items. Asbestos abatement will be required and will include asbestos tile flooring, fire stopping materials and fume hood panels. Construction Start Date is 10/9/12. ESTIMATED COST: $180,000 Bids due 10/03
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
129 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950