Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Worcester: hospital interior demolition w/hazmat
September 16, 2012
6:58 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

UMASS Medical School: Basic Wing 4th Floor Interior Demolition and Abatement. The project includes demolition of lab spaces totaling approximately 8,800 net square feet. Work will include the demolition of existing lab benches, CMU walls, ceilings, selective HVAC removal, plumbing demolition including acid waste, natural gas, lab water, compressed air and vacuum piping, electrical safe-off and selective demolition and removal of misc items. Asbestos abatement will be required and will include asbestos tile flooring, fire stopping materials and fume hood panels. Construction Start Date is 10/9/12. ESTIMATED COST: $180,000 Bids due 10/03

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
41 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar