Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Woburn: Hurld School Demolition . The scope of work includes the abatement and demolition of one one-story school building
October 6, 2024
8:54 AM
Avatar
Admin
Forum Posts: 6930
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Woburn: Hurld School Demolition . The scope of work includes the abatement and demolition of one one-story school building and associated miscellaneous site features. The building is located on Bedford Road in Woburn, Massachusetts. The scope of work also includes utility disconnection, abandonment and capping; abatement and disposal of all hazardous materials, including asbestos-containing materials (ACM), lead-containing paints, and PCB-containing materials; building demolition; disposal/recycling of all building materials; demolition of all subsurface structures (basements, foundations, footings, and frost walls); and demolition of all ancillary items and site features within the Limit of Work, backfilling and site restoration with loam and seed unless otherwise specified.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
98 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar