Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Westfield: Tekoa Reservoir Dam Removal Project.
June 2, 2019
9:11 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Westfield: Tekoa Reservoir Dam Removal Project. The work consists of demolition of the existing stone masonry spillway, the demolition of the majority of the east and west dam walls, including part of the existing gatehouse foundation and filling the portion to remain with controlled density fill, removal of the upstream concrete apron, demolition of the upstream diversion dam, removal of the existing chain link fences within the project area, tree clearing, installation of new chain link fence, placement of rip rap, and surface restoration.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
66 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar