Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - West Newbury: demolition of the existing 0.32 million gallon WST
November 25, 2018
10:45 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

West Newbury: The work of this contract generally consists of the construction of a 400,000 gallon capacity welded steel elevated spheroid water storage tank in West Newbury, MA with associated piping, appurtenances, electrical work, tank mixing system, site work, gravel access road, and underground electrical and communications duct bank (approximately 1,800 linear feet) including conduit and handholes. Other work includes the decommissioning and demolition of the existing 0.32 million gallon capacity riveted steel standpipe water storage tank at the project site ESTIMATED COST: $1,500,000

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar