South Hadley: South Hadley Wastewater Treatment Plant - Clarifiers, Slide Gates, and Valve Upgrade Project. Including: demolition of 20 slide gates and 1 gate valve, selective demolition of the gravity thickener concrete splitter box, demolition of two secondary clarifier drives, the installation 8 slide gates at the Wastewater Treatment Plant, installation of 12 slide gates at the Main Street Pump Station, installation of one plug valve at the Main Street Pump Station, and installation of two secondary clarifier drives ESTIMATED COST: $252,000