Needham: Hillside School at Central Ave. Site Demolition Project. Scope includes hazardous materials abatement from existing buildings/structures; demolition of existing buildings/structures; foundations/slabs/walls; removal and disposal of all materials associated with demolition work; all utility abandonments; filling and site re-grading; loaming and seeding of the filled and damaged areas; installing and maintaining new and existing erosion and environmental controls and installing site security perimeter fencing. ESTIMATED COST: $325,000
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
34 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090