Gloucester: Babson Reservoir Dam Rehab to include, but not be limited to: Hydrodemolition of exposed concrete surfaces of the gatehouse, bridge, core wall and spillway discharge channel walls, concrete repairs to rebuild surfaces to design geometries; demolition and removal of the chute spillway channel floor, construction of a new reinforced concrete baffled chute discharge channel floor; new concrete construction to raise the core wall crest elevation and extend the ends of the core wall. ESTIMATED COST: $2,200,000 Bids due 05/15