Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Gloucester: Hydrodemolition at Reservoir Dam
April 20, 2014
6:54 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Gloucester: Babson Reservoir Dam Rehab to include, but not be limited to: Hydrodemolition of exposed concrete surfaces of the gatehouse, bridge, core wall and spillway discharge channel walls, concrete repairs to rebuild surfaces to design geometries; demolition and removal of the chute spillway channel floor, construction of a new reinforced concrete baffled chute discharge channel floor; new concrete construction to raise the core wall crest elevation and extend the ends of the core wall. ESTIMATED COST: $2,200,000 Bids due 05/15

For details to this bid and hundreds more nationwide, go to http://www.envirobidnet.com - Take a free 30 Day Trial!

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3043

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20071

Posts: 28305

Administrators: JOHN: 7602, John: 7070

Skip to toolbar