Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Franklin: Demolition of the Existing Visitor’s Bleachers and the Construction of New Visitor’s Bleachers at the Franklin H
September 29, 2024
8:11 AM
Avatar
Admin
Forum Posts: 6930
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Franklin: Demolition of the Existing Visitor’s Bleachers and the Construction of New Visitor’s Bleachers at the Franklin High School Athletic Stadium. The work to be performed under this Contract will include, but is not limited to, providing all materials, equipment, labor, and supervision to demolish and dispose of the current visitor’s bleachers, pressbox and to construct new visitor’s bleachers at the Franklin High School Athletic Stadium as indicated on the contract documents. The work includes minor clearing and grubbing, demolition of metal bleachers and pressbox, removal of concrete footings, excavation, new concrete footings, and prefabricated structural frame aluminum bleachers.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
118 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar