Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MA - Franklin County: Freezer/Cold/Dry storage warehouse to existing facility demolition of existing structure
October 25, 2015
6:40 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Franklin County: Addition of a new Freezer/Cold and Dry storage warehouse to existing facility. Work to include demolition of existing structure; excavation; concrete foundations, frost protected slabs, pads; structural steel framing; rough and finish carpentry; insulated steel wall and roof panels; exterior and interior doors; interior finishes; loading dock; plumbing; HVAC and electrical work; and limited asphalt paving and repairs

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
112 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar