Curtis Pond Dam Removal consists of dam removal and impoundment restoration including: lowering the pond level through removal of outlet obstructions, documentation of historical artifacts and relocation of select components, installation of flow maintenance devices/temporary piping and cofferdams, demolition of the dam structure in its entirety, stockpiling of stone for reuse, remove and dispose concrete, steel, and unsuitable materials, installation of coir logs, bioengineered slope stabilization, and riprap slope protection, and monitoring of exposed pond bottom for invasive species Bids due 04/12
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
68 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030