Curtis Pond Dam Removal consists of dam removal and impoundment restoration including: lowering the pond level through removal of outlet obstructions, documentation of historical artifacts and relocation of select components, installation of flow maintenance devices/temporary piping and cofferdams, demolition of the dam structure in its entirety, stockpiling of stone for reuse, remove and dispose concrete, steel, and unsuitable materials, installation of coir logs, bioengineered slope stabilization, and riprap slope protection, and monitoring of exposed pond bottom for invasive species Bids due 04/12