

Port of New Orleans: ANDRY STREET WHARF ALLSION BY M/V DIXIE EXPRESS DAMAGE REPAIRS PHASE 1. The work consists of furnishing all labor, material and equipment for locating, demolishing, removing, and disposing of a 117-foot steel walkway, 2400-square foot concrete deck with concrete-filled steel piles, and appurtenances which were damagedby a vessel allision as per the drawings and specifications provided in this bid document. The site is located on the Mississippi River at the Andry Street Wharf in New Orleans, Louisiana.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
60 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3057
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20251
Posts: 28485
Administrators: JOHN: 7602, John: 7250