Ascension Parish: Demolition of the existing 76,510 S.F. East Ascension Hospital (Main Building Only) and associated site demolition. The project will consist of two phases, both to be included in this project. The First Phase includes abatement of Hazardous Material. The Second Phase includes demolition of the Building including all remaining components down to concrete piles. (The concrete pile caps are to be included in the demolition work).A MANDATORY PRE-BID CONFERENCE WILL BE HELD at 10:00 a.m. (CST), on June 13, 2013 at East Ascension Hospital, 615 East Worthey Street, Gonzales, LA 70737 Bids due 06/27