Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
LA - BATON ROUGE: DEMOLISHING 6 PUMP STATIONS
September 18, 2016
5:46 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Baton Rouge: MPS - PRESCOTT ROAD - GREENWELL SPRINGS ROAD. THE PROJECT CONSISTS OF DEMOLISHING 6 EXISTING AND CONSTRUCTING 5 NEW PUMP STATIONS (PSs 24/24A, 119N, 128, 183 & 503). THE FLOWS AT EACH ARE AS FOLLOWS: PS 24/24A-14.2MGD, PS 119N-1.2MGD, PS 128-1.5MGD, PS 183-1.6MGD & PS 503-3.0MGD. PS 24/24A ALSO REQUIRES AN ODOR CONTROL SYSTEM.

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
97 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar