Topic RSS
LA - Baton Rouge: bridge demolition
PRESCOTT BRIDGE REPLACEMENT OVER HURRICANE BAYOU. This project consists of the removal of the existing bridge, construction of a three (3) barrel, reinforced concrete box culvert (3 - 8x8x76) bridge and approaches, roadway pavement with base, concrete canal lining and headwalls, drainage structures, sidewalk, fencing and related work. Bids due 04/08
Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL
Forum Timezone: America/New_York
Most Users Ever Online: 429
Currently Online:
69 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950