Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KY - University of Kentucky: UK Indoor Track Facility Demolition #2584 The Demolition Package of this project includes
June 19, 2022
8:50 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOnlineSmall Online

University of Kentucky: UK Indoor Track Facility Demolition #2584 The Demolition Package of this project includes the demolition of the existing Cliff Hagan Stadium and accessory structures, as well as site and site utility demolition. The demolition of this bid package will ready the site for the new indoor track facility construction, to be issued in subsequent bid packages.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
82 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar