Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KY - UNIVERSITY OF KENTUCKY: Central Heating Plant Phase 1 Demolition This project includes the removal of asbestos on the south side of t
January 19, 2025
8:19 AM
Avatar
Admin
Forum Posts: 7150
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

UNIVERSITY OF KENTUCKY: Central Heating Plant Phase 1 Demolition This project includes the removal of asbestos on the south side of the Central Heating Plant. It will also include removal of the two coal fired boiler and selected associated piping and electrical work as shown on the contract documents. The north side and some equipment on the south side of the plant will remain active will this work is being performed. Outages will need to be scheduled for some connection and caps.

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
38 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3048

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20151

Posts: 28385

Administrators: JOHN: 7602, John: 7150

Skip to toolbar