Manchester: Spillway Modifications Downstream Imp Beech Creek Dam. The project consists of the following main activities: Demolition of existing emergency spillway structure. Removal of loose material located in the spillway channel. Construction of a new emergency spillway structure and cut-off walls. Installation of the grout curtain system along the emergency spillway. Excavation to widen the downstream spillway chute. Abandonment of existing foundation drains and reservoir fill piping. Relocation of reservoir fill piping. Construction of the downstream embankment blanket drain system. Construction of toe drains. Installation of erosion prevention and sediment control measures. Bids due 06/23
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)
Most Users Ever Online: 429
Currently Online:
95 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950