Louisville: Hazelwood Elks Building Demolition. Demolition of two buildings located on the Hazelwood Center Campus, 1800 Bluegrass Avenue, Louisville, Kentucky. Scope of work includes: BASE BID: Demolition and removal of the Elks Building. Work includes disconnection and removal of utilities. Removal of site related items such as sidewalks, paving, landscaping, etc. At completion of demolition, site shall be filled, regarded to provide positive drainage and finished with seed and straw. ALTERNATE #1: Cut, cap and remove underground water service, sewer and natural gas. Utility lines on the interior of the building will be drained and flushed. Disconnect and remove overhead electrical service and utility pole. Coordination with utility agencies will be required. ALTERNATE #2: Demolition and removal of Mack-Hill Building. Removal of site components such as paving, sidewalks, landscaping, etc. Upon completion of demolition, site shall be filled, regarded to provide positive drainage and finished with seed and straw. Estimate: $417,707.00
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
24 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950