Demolish Bldg. 38, 45, and 100. Project No. 596-12-105, Demolish Bldg. 23, 24, and 33. Project No. 596-12-107, Demolish Water Reservoir, Bldg. 44. The contractor will provide all labor, materials, tools, equipment, and construction services necessary to complete demolition requirement of all three (3) projects cited above. Construction disciplines anticipated include geotechnical, industrial, electrical, hygiene, mechanical, and horticultural. Individual project synopsis as follows; Project # 596-12-106, Demolish Buildings 38, 45, and 100. Project will remove the buildings. Building # 38 is a single story, non-inhabitable structure of 796 SF. It is the former sewage lift station building that was replaced in 2012. Building # 45 is a single story, non-inhabitable structure of 1,049 SF. It is a utility building for structure #44, the water reservoir, which has been vacated since 2005. Building # 100 is a single story, non-inhabitable structure of 6,000 SF. It is the former greenhouse and storage shed that has been vacated since 2005. The subject project will clear the site for future structures associated with the facility long term care plan. Project anticipated to last 120 days with a project magnitude between $100,000 and $250,000. Project # 596-12-105, Demolish Buildings 23, 24, and 33. Project will remove the buildings. Building # 23 is a twelve-bay garage of 2,500 SF. Building # 24 is a four-bay garage of 900 SF. Building # 33 is a single-bay garage of 200 SF. The construction firm will also clean and salvage 1,000 bricks from the buildings to turn over to the VA for future use. The bricks will be stacked on pallets containing 500 bricks each and banded. The subject project will clear the site for future structures associated with the facility long term care plan. The subject project will clear the sight for future structures associated with the facility long term care plan. Project anticipated to last 120 days with a project magnitude between $100,000 and $250,000. Project # 596-12-107, Demolish Water Reservoir, Structure 44. Project will remove the structure, Building 44. Building 44 is an abandon water reservoir that has not been in service since 2005. Bids due 05/22
For details to this bid and hundreds more nationwide, go to http://www.envirobidnet.com – Take a free 30 Day Trial!
Most Users Ever Online: 429
Currently Online:
47 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950