Kentucky: DOC - NTC Demo of Boiler House This project involves the complete demolition, removal, and disposal of the existing boiler house structure and all associated structures and features at the building site at the Northpoint Training Center. The boiler house structure is approximately 7,500 s.f. facility of varying heights. The approximate total “volume” of the building structure is around 194,000 cubic feet. The project includes the removal of hazardous materials limited to asbestos-containing materials in the sealants/backer rods at windows.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
63 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930