Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KY - Frankfort: KSU - Demolition Phase Atwood Ag Research Building
July 17, 2018
8:53 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Frankfort: KSU - Demolition Phase Atwood Ag Research Building. This project is a preliminary demolition project to remove non-structural partitions, architectural finishes, mechanical systems, and electrical systems in advance of a comprehensive building renovation. Because of the age of the existing facility and the number of renovations that have occurred over its lifetime, the intent is to utilize this project as a means to uncover and identify undocumented conditions within the building prior to finalizing bid documents for the overall renovation project. Estimate: $253,432.00

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
56 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar