Frankfort: Demolition of CSMS Building. This project encompasses the clearing of an existing site in preparation of a future construction project. The scope of work includes demolition of a one-story load-bearing masonry structure originally built in the 1960’s previously used for maintenance and repair of military vehicles. There are also several smaller out-buildings that we need to be removed. In addition, demolition and removal of existing overhead and underground site utilities will be required. Estimate: $699,751.00.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
39 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090