Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
KY - Falls of Rough: wastewater treatment plant demolition
March 24, 2012
6:25 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Removal and Dispoal of North Fork Wastewater Treatment Plant, Rough River Lake, Falls of Rough, KY. Relocate and install clarifier and sludge holding tank at Axtel Wastewater Treatment Plant, Rough River Lake - Contractor to provide a quote to remove wastewater treatment plant (recently removed from service), liftstation, fence, all electrical components, concrete, steel, motors, blowers, and filter/disinfectant unit from North Fork recreation area at Rough River Lake, Falls of Rough, KY. The clarifier and sludge holding tank will be disconnected and moved to the Axtel wastewater treatment plant. The clarifier and sludge holding tank will be installed and put into service at the Axtel wastewater treatment plant, Rough River Lake. The area where the wastewater treatment plant was removed at North Fork will be filled, packed, leveled and graveled. Bids due 04/13

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar