KY Division of Engineering and Contract Administration: BOILER #1 AND STACK DEMOLITION NORTHPOINT TRAINING CENTER DEPARTMENT OF CORRECTIONS Estimate: $248,856.00 Estimated Length of Project: 120 (Substantial Completion) + 15 (Final Completion) Project Description: This Project involves the complete demolition, removal, and disposal of the existing Boiler No. 1 and the exterior masonry stack and breech way at the boiler house structure at the Northpoint Training Center. Demolition/General Project Tasks include, but are not limited to, the following: - Demolish and dispose of the masonry stack and its foundation. - Demolish stack breech way connection to the existing boiler house structure. Provide for a “closure” of the remaining wall penetration into the boiler house. - Demolish Boiler No. 1 and legally dispose of all hazardous materials. - Disconnect/Terminate/Cap off any utilities as indicated. - Disconnect/Remove/Partially demolish any piping, conduits, platforms, access, or other materials which connect to Boiler No. 1. Remove and terminate in a safe manner such that remaining structures, piping, etc. is left in a stable (not unsafe) condition. - Remove/Move/Shift any and all other equipment/pads/etc. which may impede the removal of Boiler No. 1 materials. Items that are removed from the building shall be disposed of in a legal manner. Items to remain in the boiler house shall be left in a stable (safe) condition. -
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
63 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20052
Posts: 28286
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7050